International Journal of Economics and Management Engineering                                                                                   
International Journal of Economics and Management Engineering(IJEME)
ISSN:2225-742X(Print)       ISSN:2226-7344(Online)
Editor-in-Chief: Prof. Jeffrey E. Jarrett (USA)
Impact of Flexibility and Employees’ Preferences on Shift Scheduling: a Simulation Approach
Full Paper(PDF, 149KB)
Abstract:
This article presents a simulation approach for staffs scheduling and rescheduling into a dynamic environment of a paced multi-product assembly center based on multi-agent algorithm. Our purpose is to investigate the impact of modelling flexibility and employee preferences, on the quality and- cost of the shift-scheduling solutions. The proposed simulation takes into consideration the individual competencies, mobility and preferences of each employee, as well as the personnel and competency requirements associated with each assembly activity given both the current master assembly schedule and the line balancing for each product. Experimental results show that flexibility may lead to a reduction of the staff’s cost allocation and improve employee satisfaction.
Keywords:Personnel Shift Scheduling; Multi-Agent Systems; Employee’ Preferences; Cross-Training; Flexible Work Schedule
Author: Mohamed SABAR1, Amine ZENJARI1
1.Management Department, Groupe ISCAE: Groupe Institut Supérieur de Commerce et d'Administration des Entreprises Km 9,500 Route de Nouasseur BP. 8114 - Casablanca Oasis, Casablanca, Maroc
References:
  1. G. Hao, K. K. Lai, and M. Tan, “A neural network application in personnel scheduling,” Annals of Operations Research, vol. 128, nos. 1-4, pp. 65-90, 2004.
  2. G. M. Thompson, “Improved implicit optimal modeling of the labor shift scheduling problem,” Management Science, vol. 41, no. 4, 595-607, 1995.
  3. A. T. Ernst, H. Jiang, M. Krishnamoorthy, and D. Sier, “Staff scheduling and rostering: A review of applications, methods and models,” European journal of operational research, vol. 153, no. 1, pp. 3-27, 2004.
  4. M. Sabar, B. Montreuil, and J. M. Frayret, “Competency and preference based personnel scheduling in large assembly lines,” International Journal of Computer Integrated Manufacturing, vol. 21, no. 4, pp. 468-479, 2008.
  5. M. Sabar, B. Montreuil, and J. M. Frayret, “A multi-agent-based approach for personnel scheduling in assembly centers,” Engineering Applications of Artificial Intelligence, vol. 22, no. 7, pp. 1080-1088, 2009.
  6. M. Sabar, B. Montreuil, and J. M. Frayret, “An agent-based algorithm for personnel shift-scheduling and rescheduling in flexible assembly lines,” Journal of Intelligent Manufacturing, vol. 23, no. 6, pp. 2623-2634, 2012.
  7. J. Bailey and J. Field, “Personnel scheduling with flex shift models,” Journal of Operations Management, vol. 5, no. 3, pp. 327-338, 1985.
  8. L. W. Jacobs and S. E. Bechtold, “Labor utilization effects of labor scheduling flexibility alternatives in a tour scheduling environment,” Decision Sciences, vol. 24, no. 1, pp. 148-166, 1993.
  9. M. Rekik, J. F. Cordeau, and F. Soumis, “Implicit shift scheduling with multiple breaks and work stretch duration restrictions,” Journal of Scheduling, vol. 13, no. 1, pp. 49-75, 2010.
  10. K. Joyce, R. Pabayo, J. A. Critchley, and C. Bambra, “Flexible working conditions and their effects on employee health and wellbeing,” Cochrane Database Syst Rev, vol. 2, 2010.
  11. M. Rekik, J. F. Cordeau, and F. Soumis, “Using benders decomposition to implicitly model tour scheduling,” Annals of Operations Research, vol. 128, no. 1-4, pp. 111-133, 2004.
  12. S. E. Bechtold and L. W. Jacobs, “Implicit modeling of flexible break assignments in optimal shift scheduling,” Management Science, vol. 36, no. 11, pp. 1339-1351, 1990.
  13. M. J. Brusco, and L. W. Jacobs, “Optimal models for meal-break and start-time flexibility in continuous tour scheduling,” Management Science, vol. 46, no. 12, pp. 1630-1641, 2000.
  14. R. Stolletz, “Operational workforce planning for check-in counters at airports,” Transportation Research Part E: Logistics and Transportation Review, vol. 46, No. 3, pp. 414-425, 2010.
  15. L. W. Jacobs, and M. J. Brusco, “Overlapping start-time bands in implicit tour scheduling,” Management Science, vol. 42, no. 9, pp. 1247-1259, 1996.
  16. S. Topaloglu and I. Ozkarahan, “An implicit goal programming model for the tour scheduling problem considering the employee work preferences,” Annals of Operations Research, vol. 128, no. 1-4, pp. 135-158, 2004.
  17. S. J. Deery and A. Mahony, “Temporal flexibility: Management strategies and employee preferences in the retail industry,” Journal of Industrial Relations, vol. 36, no. 3, pp. 332-352, 1994.
  18. J. Gärtner, “Conflicts between employee preferences and ergonomic recommendations in shift scheduling: regulation based on consent is not sufficient,” Revista de saúde pública, vol. 38, pp. 65-71, 2004.
  19. Z. Cai, J. L. Morris, and J. Chen, “Explaining the human resource management preferences of employees: a study of Chinese workers,” The International Journal of Human Resource Management, vol. 22, no. 16, pp. 3245-3269, 2011.
  20. C. Timms, P. Brough, M. O'Driscoll, T. Kalliath, O. L. Siu, C. Sit, and D. Lo, “Flexible work arrangements, work engagement, turnover intentions and psychological health,” Asia Pacific Journal of Human Resources, 2014.
  21. K. A. Dowsland, “Nurse scheduling with tabu search and strategic oscillation,” European journal of operational research, vol. 106, no. 2, pp. 393-407, 1998.
  22. K. A. Dowsland and J. M.Thompson, “Solving a nurse scheduling problem with knapsacks, networks and tabu search,” Journal of the Operational Research Society, vol. 51, no. 7, pp. 825-833, 2000.
  23. F. F. Easton, “Cross-training performance in flexible labor scheduling environments,” Iie Transactions, vol. 43, no. 8, pp. 589-603, 2011.
  24. M. Rocha, J. F. Oliveira, and M. A. Carravilla, “Quantitative approaches on staff scheduling and rostering in hospitality management: An overview,” American Journal of Operations Research, vol. 2, p. 137, 2012.
  25. Z. Sinuany-Stern and Y. Teomi, “Multi-objective scheduling plans for security guards,” Journal of the Operational Research Society, pp. 67-77, 1986.
  26. D. M. Warner, “Scheduling nursing personnel according to nursing preference: A mathematical programming approach,” Operations Research, vol. 24, no. 5, pp. 842-856, 1976.